These will not be available in any depth until logic solver equipment selection has taken place, which often happens much later in a project than would be advisable for the FSA 1 activity to take place.IEC 61511 conformance: Each of the requirements outlined in Clause 5 through Clause 19 has been satisfied to the defined criteria and therefore the clauses objectives have been met IEC 61511-1 Clause 4.
Iec 61511 Part 1 Install The SISLets take a relatively simple example from one of the shortest IEC 61511 clauses: 14.1 Objective - SIS installation and commissioning The objective of the requirements of Clause 14 are to: install the SIS according to the specification and drawings; commission the SIS so that it is ready for final system validation.